Project Image
IPP
MIni Grids

Power Generation

Year
2025
Industry
Independent Power Producer | Mini Grids | Distributed Platforms | Utility-Scale | (PPAs & Wheeling)
Scope of work
Build, Own and Operate Solar Power Plants
Timeline
6-18 Months

What We Do

We develop and operate utility-scale solar under PPAs and wheeling frameworks. Projects are staged in 10–40 MW blocks to manage risk, with grid-forming-ready designs, rigorous compliance and telemetry-verified availability once online.

We solve the system-level pain of capacity shortfalls, diesel reliance and tariff volatility. Our model brings bankable pricing, disciplined delivery and operated assets that report performance monthly to utilities and lenders.

How We Do it

Development and operation of ground-mount solar plants with utility interconnection, performance monitoring and long-term O&M.

Development & Permits

Land control, studies, ESIA-lite, interconnection applications.

Grid & Design

Utility-aligned plant design; PPA/wheeling structure.

EPC Oversight & Commissioning

HSE oversight, FAT/SAT, grid compliance; staged energisation.

Operate & Report

Telemetry, availability SLAs, compliance and lender reporting.

~6 yrs
Payback Period under current tariffs.
>45 MW
IPP pipeline under review across group of companies.
20%
avg. Project IRR (unlevered).
+15 yrs
PPA backed offtake agreement - Private Sector & Utility-Scale
Ready to say goodbye to load shedding and rising costs at no additional cost?
Apply for project aurora now!
Apply to Aurora

Solar solutions, stunning Project

See how we’ve helped brands grow and succeed.

Explore our premium templates
Need to customize this template